GOC418012-CONTRACTOR-NOO - Contractor Services – 3 & 6 Year Electrical Maintenance

Print Follow
Closed

Basic Information

Reference Number

0000080949

Issuing Organization

PWGSC RP1

Owner Organization

PWGSC RP1

Project Type

RFQ - Request for Quote (Formal)

Project Number

GOC418012-CONTRACTOR-NOO

Title

Contractor Services – 3 & 6 Year Electrical Maintenance

Source ID

PU.DP.Que..8088.29965.C210302

Details

Location

Canada, Ontario, ON - 6 - Sudbury

Job Location

19 Lisgar Street, Sudbury ON

Dates

Publication

Mar 06, 2018 05:11 PM EST

Question Acceptance Deadline

Mar 13, 2018 02:00 PM EDT

Questions are submitted online

Yes

Closing Date

Mar 16, 2018 02:00 PM EDT

Prebid Conference

Mar 09, 2018 02:00 PM EST

Contact Information

Rajesh Gupta

905-943-2014

rajesh.gupta@brookfieldgis.com

Description

Statement of Work/Overview:
 
GOC418012:
A brief description of the scope of work is as follows:

  1. The Contractor shall perform a visual and mechanical inspection on all electrical equipment shown in the List of Inventory Equipment Table #1 and Single Line Diagram (SLD).
  2. Inspection and testing activities shall include all tasks which can be safely performedwhile the building electrical power system is energized or during power shutdown including but not limited to the following. Inspection work should be in alignment with the latest CMMS Preventative Maintenance Schedule, the National Electrical Code, and Electrical Safety Authority (ESA)' guidelines:
  •  Inspect, clean and document as found conditions on electrical and mechanical equipment;
  • Compare equipment nameplate information with the latest single-line diagram; report and fix discrepancies;
  • Check for proper anchorage, clearances, physical damage and proper alignments; Inspect and clean all bus connections;
  • Tighten and torque cable in lugs as per cable manufacturer recommendations,
  • Verifying for proper installations;
  • Verification of appropriate lubricant;
  • Exercise main air circuit breakers and tie breaker to verity their operability
  1. Contractor to prepare and document progress site photos of all repairs done (before and after) and ensure all info/photos with corresponding area of work description are attached in the close out manuals per project. The Contractor shall utilize color photography todocument any identified concerns or potential problem areas for review and action by the Owner and Consultant.
  2. Install/replace on new equipment or missing CMMS number on existing with new.
Please refer to the tender specicications for more details.
 

See more

Required Acknowledgement

GOC418012-CONTRACTOR-NOO

By submitting your response to this solicitation, your company agrees to provide, all documentation without modification as defined in this solicitation prior to award.
BGIS reserves the right to reject your proposal/submission/solicitation should we fail to receive the required documentation.
 

Pre-Bidding Events

  • Event Type

    Prebid Conference

    Attendance

    Mandatory

    Event date

    Mar 09, 2018 02:00 PM EST

    Location

    19 Lisgar Street, Sudbury ON

    Event Note

    Mandatory Teleconference:
    March 09, 2018, at 2:00PM -  details as follows:
    Teleconference Dial-in: 1-877-708-3350
    Participant Access code: 3091816 #
     

     

    See more

Bid Submission Process

Bid Submission Type

Electronic Bid Submission

Pricing

Lump sum

Pricing

Lump sum

Bid Documents List
Item Name Description Mandatory
Bid Documents Documents defining the proposal No
Additional Bidding Instructions

All respondents must submit their questions for clarification on this portal only at www.brookfieldgis.merx.com. Request for clarification delivered by any other method will not be accepted.
 